Skip to content

The building we promised, on the date we promised.

Handover date, payment plan and floor area are all in the same contract. On 46 projects, we handed over the keys in the month the contract said.

Yakamoz Rezidans in the evening: two white blocks, warm light in the windows, the garden path between them and olive trees.

Yakamoz Rezidans

Güzelbahçe, İzmir. Evening.

Status
For sale, last 8 units
Units
124 apartments
Built
Feb 2024 – Dec 2025, 22 months

Contract: December 2025Handed over December 2025, as promised

Permit to keys in two years at most.

The same facts for every project: where, how many units, when it started. The line spans two years; the mark is the handover month in the contract.

  1. Two residential blocks and a lit garden path in the evening.

    Kordon Rezidans

    Karşıyaka, İzmir

    Status
    For sale
    Units
    86 apartments
    Built
    Jun 2025 – Mar 2027, 21 months

    Contract: March 2027Month 16 today, on schedule

  2. The reinforced concrete frame of a residential block under construction, and the building site.

    Yeni Mahalle Konutları

    Menemen, İzmir

    Status
    Under construction
    Units
    312 apartments
    Built
    Oct 2025 – Sep 2027, 23 months

    Contract: September 2027Month 12 today, on schedule

  3. A small three-storey house of local stone in an olive grove; design rendering.

    Taş Konak

    Seferihisar, İzmir

    Status
    Under construction
    Units
    6 apartments
    Built
    Sep 2026 – Jun 2028, 21 months

    Contract: June 2028Month 1 today, on schedule

  4. A twenty-two-storey office tower with a glass and concrete facade, seen from below.

    Kule Ofis

    Bayraklı, İzmir

    Status
    Completed
    Units
    64 offices, 22 floors
    Built
    Jan 2020 – Nov 2021, 22 months

    Contract: November 2021Handed over November 2021, as promised

  5. Single-storey flat-roofed villas among pine trees.

    Çamlık Villaları

    Urla, İzmir

    Status
    Completed
    Units
    12 villas
    Built
    Mar 2022 – May 2023, 14 months

    Contract: May 2023Handed over May 2023, as promised

  6. Aerial view of two residential blocks and the landscaped garden between them.

    Bahçeli Evler

    Buca, İzmir

    Status
    Completed
    Units
    148 apartments, 4 blocks
    Built
    Mar 2017 – Oct 2018, 19 months

    Contract: October 2018Handed over October 2018, as promised

  7. All seven projects, in a list you can filter by status.

    All projects
Skip the animation

Yakamoz Rezidans, permit to keys in 22 months.

Evening: the building with its windows lit and olive trees in front; the last frame of the construction animation.

Animation, not to scale.

  1. Building permitFebruary 2024

    The permit and soil survey are in the file at the sales office.

  2. Foundation pourApril 2024

    The raft foundation pour is on file with the building inspection report.

  3. StructureDecember 2024

    Seven floors went up in ten months. The site manager and inspection engineer were on site every day.

  4. Occupancy permitNovember 2025

    Gross and net area are listed separately in the contract, and the occupancy permit was issued for those same figures.

  5. HandoverDecember 2025

    The contract said December 2025, and the first keys were handed over in December 2025.

One job since 1998: buildings.

It started with a six-unit apartment building that two engineer brothers put up in Buca. Today the second generation runs the company.

Founded
1998
Projects delivered
46
Units
3,120
Longest build
23months
A drawing table, a hard hat and rebar ties between concrete columns on site.
Site manager and inspection engineer on site every day.

The documents are on file at the sales office.

We go through every document you should ask about before buying, together, at the office. We check the title record on e-Devlet, Turkey's government portal, right in front of you.

  • Building permitFebruary 2024
  • Soil survey reportDecember 2023
  • Building inspection reportsMonthly
  • Occupancy permitNovember 2025
  • Title recordNo mortgages or liens
  • Sample contractHandover date in its own clause

Four steps from apartment to keys.

Who does what at each step is written in the contract.

  1. Project and apartment

    Compare the projects and tour the show apartment at the sales office.

  2. Plan and price

    You get the floor plan, orientation and final price of your apartment in writing.

  3. Contract and title

    The payment plan goes into the contract, and an appointment is booked for the title transfer.

  4. Handover

    We walk through the apartment together. The snag list is signed off and completed within 30 days.

What buyers ask before deciding.

Answers to the five questions buyers ask most.

Is the handover date in the contract?

Yes. The exact handover date, and what we pay if we're late, are in a separate clause. None of our projects has taken more than two years to build, and we don't give dates verbally.

Is there an occupancy permit?

Yakamoz Rezidans received its occupancy permit in November 2025. For projects under construction, the expected date is in the schedule, and the permit is added to the project page once it's issued.

Are there any mortgages or liens on the title?

No. The apartments for sale have no mortgages or liens on their titles. We can check the title record together on e-Devlet at the sales office.

How are net and gross floor areas shown?

Both are listed separately for every apartment type, and both go into the contract.

How do I make payments?

All payments go through the bank, with the block and apartment number in the reference. We don't accept cash.

Let's tour the show apartment together.

Book a visit and the project manager will meet you and go through the documents with you. Fill in the form and we'll call you the same business day.

Sales office

Yakamoz Rezidans, Block A, Güzelbahçe

Open
Monday to Saturday, 9:00–18:00
Visit
About an hour
Bring
Just your ID; the documents are at the office

Concept demo: this form isn't sent anywhere. Fields marked * are required.